What it costs
His prices, as he gave them to us. No call-out charge is added on top of the hourly rate, and nothing starts until you have agreed the price.
HIU servicing
| Single property | £130 |
|---|---|
| Up to 5 properties | £120 each |
| 5 to 10 properties | £100 each |
The lower rates are per property when they are done in the same visit.
HIU repairs
£140
call-out fee to investigate, then priced per job once diagnosed.
HIU replacement
£750
labour only. The HIU and materials are priced separately.
Heating and plumbing
£150
per hour, minimum 1 hour. Radiators, leaks, drainage, toilets, sinks and taps, cylinders and heating controls.
Prices are for labour. Parts and materials are quoted separately and we tell you before anything is ordered. Monday to Friday, 8am to 5pm.
For landlords, letting agents and managing agents
Several flats in one visit, at a lower price per flat. It is how most of the blocks we look after do it.
HIU servicing, per property
| Single property | £130 |
|---|---|
| Up to 5 properties | £120 each |
| 5 to 10 properties | £100 each |
Per property, done in the same visit. More than 10 units, ring and we will price it.
- 1Tell us how many
The block or the portfolio, how many units, and whether they are on the same riser. That is all we need to price it.
- 2We agree a day
One visit, done in sequence. You tell residents, or we can work to a schedule you set.
- 3The work
Strainers out and cleaned, exchangers checked, actuator and controls tested on both heating and hot water, flow temperature read against what the building is sending.
- 4One report at the end
What we found in each flat, in plain words, with anything worth watching flagged before it becomes a call-out.
Frequently asked questions
Questions about price
Is there a call-out charge on top?
No. Heating and plumbing is £150 an hour with a one hour minimum and that is the whole labour charge. For a heat interface unit there is a £140 call-out to diagnose the fault, and the repair is priced after that once we know what it is.
Are parts included?
No. Prices are for labour. Parts and materials are quoted separately and we tell you what they cost before anything is ordered.
Why is HIU replacement labour only?
Because what goes in depends on what the building will accept, and most managing agents have a list. £750 is the labour; the unit and the materials are priced once we know which one it is.
Do you charge more for the far end of the patch?
No. The rate is the same in Romford as it is in Dartford or Epping.
When do I pay?
After the work, once you have seen it working. Nothing starts until you have agreed the price.
Call us for your instant no-obligation quote
Tell us what needs doing and we will tell you what it takes. No obligation, and nothing starts until you have agreed the price.
Get in touch
Tell us what is happening and where the property is. A photo of the unit, the fault code or the leak answers more than a paragraph does.
The plumber was really good. He fixed the HIU that was leaking. Now it doesn’t leak anymore, and everything works perfectly. He did a great job!
Good HIU service, knows his staff well and very quick and the gentleman even helped fixed error code on ambiente heating system, which was not part…
